Pipe and Cable Plow Method

The FRANK FÖCKERSPERGER Plow Method.

has been used with great success since 1971 for the trenchless installation of power cables and telephone lines. Since the development of flexible pipe materials (HDPE) in the 1980s, approximately 800 civil engineering and pipe installation companies as well as numerous providers or private building owners place their trust in our competence in installing supply and disposal pipelines.

In the course of time, we have carried out more than 15,000 construction measures and installed more than 80,000 km of pipe and cable using the plowing method.